The Staten Island Railway (SIR), the only rapid transit line in the New York City borough of Staten Island, is operated by the Staten Island Rapid Transit Operating Authority, a unit of the Metropolitan Transportation Authority. The railway is considered a standard railroad line, but only the western portion of the North Shore Branch, which is disconnected from the rest of the SIR, is used by freight and is connected to the national railway system.
Railways on Staten Island began in 1836 and have been used for passenger and freight service. At the apex of rail service, passenger lines went to the southern, eastern, and northern shores of Staten Island; many of these lines were demolished in the mid-20th century. Today, one passenger line operates between Saint George and Tottenville along the east side of the borough. There is currently no passenger service for residents on the western or northern sides of the borough, but Staten Island light rail has been proposed for these corridors. Freight service in northwestern Staten Island was withdrawn in the 1970s and was restored in the 2000s. Until the completion of the Verrazano-Narrows Bridge in 1964, Staten Island's only direct connection to the rest of the city and state of New York was via ferries from St. George at the north end of the island.
Video History of the Staten Island Railway
First line: 1836-1885
Initial efforts: 1836-1860
The railway's predecessor, the Staten Island Rail-Road Company, was incorporated on May 21, 1836, for a line "commencing at some point in the town of Southfield, within one mile of the steamboat landing at the Quarantine, and terminating at some point in the town of Westfield; opposite Amboy". It ran between the present-day locations of Clifton and Tottenville. The 13-mile (21 km) route had an estimated cost of $300,000. The railroad charter allowed for either a single or double-tracked line to be operated by steam locomotives, but the company lost its charter in 1838, because the railroad was not built within two years after it was incorporated.
Attempts to start a rail line on the island were restarted in 1849 and 1850, when residents of Perth Amboy and Staten Island held meetings concerning a possible Tottenville-to-Stapleton line. While they were a factor in creating the line, William Vanderbilt--a son of Cornelius "Commodore" Vanderbilt and a resident of Staten Island--conceived of the railroad as a way to reduce the monopoly of the Camden and Amboy Railroad, which was the only means of reaching Philadelphia. Passengers would take ferries from New York City to Amboy, the railroad to Camden, and finally a ferry to Philadelphia. Vanderbilt thought his railroad would cut travel times--passengers would take a ferry from New York to Staten Island, then take his railroad, before taking a ferry to Amboy--and eliminate the monopoly of the Camden and Amboy between New York City and its terminus in Amboy. This charter for the Staten Island Railroad Company was signed on August 2, 1851, and the articles of association were filed on October 18, 1851. When the plan was presented to him, he accepted the idea, which was essentially the same route he proposed. In 1852, the line was expected to cost $322,195. Two possible route options were considered; the first would start at New Ferry Dock in Stapleton, before passing through Rocky Hollow, following the valley between Castleton and Southfield Heights before descending to New Dorp. After going 4 miles (6.4 km) through the valley, the line would curve toward Amboy Road before curving southward, passing Billop House, and ending near Biddle's Grove and the Amboy ferries. The second route would start at Vanderbilt's Landing and run through Clifton to New Dorp.
The railroad's charter gave it two years to be built. Like the original plan for the line, however, difficulties were encountered. One problem was the acquisition of property for the line's right-of-way; many property owners refused to sell their land, blocking the proposed line. To prevent the loss of the line's charter, in 1853, the company successfully petitioned for a two-year extension to build the line. In 1853, a bill giving the company the right to operate ferries between New York and Staten Island was passed. Still facing difficulties, in January 1855, the company applied to the New York State Legislature for a three-year extension to complete the project. After all of the property required for the right-of-way was acquired, construction commenced in November 1855. The company, however, had run out of money to complete the line and asked Cornelius Vanderbilt--the sole Staten Island-to-Manhattan ferry operator--for a loan. Vanderbilt agreed to finance the railroad, but he changed the northern terminal of line from Stapleton to his ferry landing further east; Vanderbilt's Landing. Vanderbilt tried to stop competitors who had previously owned the railroad's lease; he appointed James R. Robinson to build a structure to block his competitors but on July 28, 1851, people tried to deconstruct the almost-finished structure and threatened to hurt Robinson if he tried to block them. In 1858, Cornelius's son William Vanderbilt was inducted onto the railway's board of directors.
Opening: 1860
Stockholders and officials took an inaugural ride on the double-track line between Vanderbilt's Landing and Eltingville on February 1, 1860; and passenger operations began on April 23 that year. At Vanderbilt's Landing, passengers continued their passage to Manhattan by ferry. The first locomotive was named "Albert Journeay", after the railroad's president. A second locomotive was added to the line on May 5, 1860; it was named "E. Bancker" after the company's vice-president. The remainder of the line was expected to be completed in a month.
Over the next month, the remainder of the line was built between Annadale and Pleasant Plains as a single-track line, with a passing siding at Huguenot, passing through mosquito-infested land laced with peat bogs and quicksand--an area known locally as Skunk's Misery. It took a lot of time and wood to built the sub-roadbed with logs. It was unlikely viewed as a worthwhile investment to double-track the line because of the low passenger volume south of New Dorp. South of Pleasant Plains, the line was double-tracked. The line was extended to Annadale on May 14, 1860, and was completed to Tottenville on June 2, 1860, with a formal opening of the railroad. The completion of the line to Tottenville allowed passengers to transfer to a ferry that crossed the Arthur Kill and allowed passage to Perth Amboy, New Jersey. Initially, services made eleven stops between Vanderbilt's Landing and Tottenville. Many stations were named after nearby large farms, such as Garretson's and Gifford's. More elaborate structures were put in place at Eltingville and Annadale--whose namesakes, the Eltings family and Anna Seguine, were influential in paying for the construction of the rail line. The arrival of the railroad gave dignity to some locations on Staten Island; "Poverty Hollow" was renamed Rosebank, Oakwood became Oakwood Heights, and other places were renamed with the coming of the railroad.
In August 1860, the railroad was extended from the depot at Vanderbilt's Landing to the wharf, which allowed passengers to walk directly to the boat from the train instead of walking 100 feet (30 m) along the sand. At the time, it took one and a half hours to get to Tottenville from Manhattan. Patronage of the rail line exceeded the greatest expectations of its projectors. On February 27, 1861, the New Jersey Locomotive Works gave notice of foreclosure on the two locomotives; Cornelius Vanderbilt interceded again and on September 4, 1861, the Staten Island Railway was placed into receivership with William Vanderbilt to prevent the loss of the locomotives and rolling stock to creditors. The Vanderbilts had taken stock in the railroad but in 1863, William Vanderbilt managed the receivership well enough to be discharged, having paid off the debt. As a result, the railroad became property of the Vanderbilts; facilities were enlarged under their leadership--an expansion made possible by increasing the capital stock to $800,000 from $350,000.
On October 5, 1861, possibly the first major accident on the railroad occurred; Mary Austin, age 16, was killed by a train at Princess Bay as she crossed the tracks.
Ferry conflicts: 1860-1884
Ferry service between Perth Amboy and Tottenville began in 1863, and was operated by the Staten Island Railway.
It was necessary to have a direct connection between the trains and the infrequent ferries to and from Manhattan, but this was difficult during the beginning of operation. The ferries serving Vanderbilt's Landing were owned by George Law. Vanderbilt tried to operate a ferry service between Manhattan and Staten Island that would compete with Law's. He also started construction on a central dock on the island, but he abandoned the scheme after a storm destroyed the timber work. Only the large stone foundation remained; it was still visible at low tide in 1900.
Vanderbilt was eventually forced to sell his ferry service to Law after a franchise battle. After the battle, Vanderbilt lost interest in transit operations on Staten Island and he handed the ferry and railroad operations to his brother Jacob H. Vanderbilt, who was the president of the company until 1883. In March 1864, Vanderbilt bought Law's ferries, bringing both the railroad and the ferries under the same company. In 1865, the railroad took over operation of the New York & Richmond Ferry Company, and would later assume direct responsibility for operating the ferry service to Manhattan. The Perth Amboy and Staten Island ferries were taken over by the railroad under the leadership of Jacob Vanderbilt, who increased service.
The Staten Island Railroad and its ferry line were making a modest profit until the boiler of the ferry "Westfield" exploded at Whitehall Street Terminal on July 30, 1871, killing 85 and injuring hundreds. As president of the railway, Jacob Vanderbilt was arrested but was not charged. As a result of the disaster, on March 28, 1872, the railway and the ferry went into receivership. On September 17, 1872, the property of the company was sold to the attorney George Law in foreclosure, with the exception of the ferry "Westfield", which was purchased by Horace Theall. After operating the railroad and ferry for some time, Law and Theall sold out to a company composed largely of shareholders; Law threatened to form a company of his own if they did not come to his terms promptly. Some of the smaller stockholders neglected to join in the purchase. The charter for the Staten Island Railway was created on March 20, 1873, and on April 1, 1873, Law transferred Staten Island Rail Road's property to the Staten Island Railway Company for $480,000. The ferry operation was transferred to the newly-formed Staten Island Railway Ferry Company. The ferry and rail services were split into separate rail companies to prevent one from leading to the demise of the other, while ensuring that connecting service could still be provided for passengers.
During the American Civil War, a boat connected with the Staten Island Railway, the "Southfield" was sold to the government, and was converted into a gunboat; it was destroyed during a bombardment on Mississippi. In 1876, a ferry war broke out on the North Shore of Staten Island; Commodore Garner obtained possession of the ferry against the old company and ran the "D. R. Martin" on the East Shore in opposition to the regular line. Garner's death put a sudden end to this enterprise and his boats were purchased by John H. Starin, who paid $5,000 for each of them. Starin obtained a franchise, which he operated until it fell into the hands of the SIRT on August 31, 1884.
Maps History of the Staten Island Railway
SIRT/B&O operation: 1880-1900
Organization: 1880-1884
By 1880, the Staten Island Railway was barely operational, and as a result New York State sued through Attorney General Hamilton Ward to have the company dissolved in May that year. The suit said the Company had become "insolvent in September 1872, to have then surrendered its rights to others, and have failed to exercise those rights". The legal proceedings commenced after an injunction was obtained that restrained the creditors of the railway company from proceeding against it until after the suit of the people was determined. Although it was floundering, the railroad become the centerpiece for a plan to develop the island by a Canadian, Erastus Wiman. In 1867, Wiman arrived in New York to oversee the main office of Dun, Barlow, and Company in New York. Wiman became one of the most prominent residents of Staten Island after moving into a mansion there. He was dubbed the "Duke of Staten Island," and was interested in developing the island; Wiman recognized that to succeed he would need to build a coordinated transportation hub with connections to New York City and New Jersey. To this purpose he incorporated The Staten Island Rapid Transit Railroad Company on March 25, 1880. It was officially incorporated on April 14, 1880.
Wiman's plan called for a belt system using two miles of the old Staten Island Rail Road, between Vanderbilt's Landing and Tompkinsville, and the coordination of all ferries from one terminal. Previously, there were six to eight of them located near Saint George. Wiman sought to expand the line and approached Robert Garrett, president of the Baltimore & Ohio Railroad, to back the building of a large rail terminal on the island and centralize the ferry landings; Garret agreed. The SIRT began to seek legislation to acquire various rights-of-way needed to implement Wiman's plan. At that time, his company neither owned nor controlled a railroad. If the company gained a charter to build connections, it would have had nothing to connect to. The company then began surveying for the proposed routes; in April 1881, it acquired 1.5 miles (2.4 km) of critical right-of-way directly from George Law. When Wiman explained his plan he secured a waterfront option from Law; however, Law refused to renew the option a second time. To persuade Law to renew the option, Wiman offered to name the place "St. George." Law was humored by the gesture and granted Wiman the option. In October 1882, Wiman made an application for a wharf to land passengers from the company's planned new ferry service to Manhattan.
Clarence T. Barrett, Henry P. Judah, and Theodore C. Vermilyen were appointed as commissioners to appraise the value of the land required by the Staten Island Rapid Transit Railroad Company to extend the Staten Island Railroad from Vanderbilt's Landing to Tompkinsville. Work on the line was delayed until the commissioners reported. The SIRT filed a map of the proposed route at the office of the clerk of Richmond County. The line as planned would cross the lawn of Ms. Post on the North Shore of the island; on February 26, 1883, Mr. Franklin Bartlett and Mr. Clifford Bartlett, on behalf of Ms. Post, notified the court a change of route would be demanded. After leaving Vanderbilt's Landing, the newly proposed line crossed the property formerly occupied by the Seaman's Retreat; by then acquired for the state by the Marine Society. It would then traverse the property of the New York Coast Wrecking Company; the lumber yards of C. C. Eddy & Sons; the carriage factory of J. Scott; the Schaeffer grounds; property represented by Coudert brothers; the grounds of George Bechtel; Rubsnin & Horrman, the brewers; S. L. Mulford & Co.'s coal and wood yard, and lands of Samuel Barton and W. Butler Duncan. Apart from Scott's carriage factory, the only other building upon the line was a small barn on the Schaeffer grounds. The cost of the extension was estimated to be $150,000.
On April 3, 1883, the Staten Island Rapid Transit Railroad Company gained control of the Staten Island Railroad and its boats. On the same date, at the annual meeting of the Staten Island Railroad company, Erasmus Wiman gained control of the railroad by being elected to the board of Directors of the Railroad and becoming the railroad's president. At the meeting, Wiman laid out his proposals for rail lines on Staten Island. He proposed extending the old Staten Island Railroad to Hyatt Street in what is today Saint George. From there, a line would run through New Brighton and Snug Harbor along the island's North Shore. The line would then go inland, running parallel to the Kill Van Kull. Based on the settling of the island's interior, additional spur lines would have been built. Wiman also proposed a bridge across Arthur Kill from Tottenville to Perth Amboy, replacing the ferry that operated there. This would have been part of a direct route between New York City and Philadelphia via Perth Amboy and South Amboy, with a new bridge over the Raritan River. In the days before the meeting, Wiman had gained 7,450 out of the 11,800 shareholders to elect him, surprising many of the directors of the railroad. By the end of the month, Wiman resigned from the Staten Island Rapid Transit Company to avoid any conflict of interest. On June 27, 1883, a meeting of the directors of both companies formally ratified the merger of the two companies under the leadership of Erastus Wiman, who was named president. On June 30, 1883, the Staten Island Rapid Transit Railroad Company leased the Staten Island Railway for a term of 99 years, to become effective when the line opened between Clifton and Tompkinsville.
While the control of the railroad included control of Vanderbilt's ferry, the North Shore Ferry was leased separately and was operated by John H. Starin, whose lease was set to expire on May 1, 1884. On July 18, 1884, the Staten Island Rapid Transit Railroad Company outbid Starin for the North Shore operation. As part of the purchase, ferry service would have been operated every forty minutes instead of every hour. The fare for the railroad and the ferry would have been ten cents, except between five and seven in the morning and evening, when it would have been seven cents. Starin continued to fight the lease in the courts for several years.
Expansion: 1884-1900
A controlling interest in the Staten Island Rapid Transit Company was obtained by the Baltimore & Ohio Railroad (B&O) in 1885 through purchases of stock. On November 21, 1885, Robert Garnett Tatlow, President of the B&O, leased the Staten Island Rapid Transit Railroad Company to the B&O for 99 years, which gave the B&O access to New York. Wiman needed the proceeds of the sale to pay for the construction of the North Shore Branch. The funds also helped pay for the construction of a bridge over the Kill Van Kull, the acquisition of 2 miles (3.2 km) of waterfront property, and for terminal facilities at Saint George. In 1885, Jacob Vanderbilt retired as President of the Staten Island Railway. The new lines opened by the B&O were called the Staten Island Rapid Transit Railway, while the original line from Clifton to Tottenville was called the Staten Island Railway. By 1886, the operations of the Staten Island Railway were leased to the SIRT; even under B&O ownership it was kept as a separate corporation. The passenger cars used by the Staten Island Railway were leased by the SIRT.
Construction of the North Shore Branch began on March 17, 1884, after a number of legal proceedings; a party of surveyors started marking out the grades and broke ground for the roadbed. The rights of a horse car line to operate in Richmond Terrace were bought to build the line; the right of way followed the island's North Shore and reached a ferry to Elizabeth, NJ that had been operating since the mid-1700s. The B&O built about 2 miles (3.2 km) of rock fill out from shore and along the Kill Van Kull to deal with opposition from property owners in the neighborhood of Sailors' Snug Harbor, costing an additional $25,000. The company underwent a contest in litigation to acquire property for the line to pass over the cove at Palmer's run. Some properties in Port Richmond were acquired, displacing several home and business owners. A farm on the northwestern corner of Staten Island at Old Place--which was renamed Arlington by the B&O--was also purchased.
Grading work on the section between Clifton (previously Vanderbilt's Landing) and Tottenville began at this time, and during early 1884, construction continued with such energy that this section, which had been expected to open on September 1, opened on July 31 that year. The first train on the section contained the managers and officers, a few invited guests, and several passengers who had come up on the train as it came on its regular time from Tottenville. The ride took three and a half minutes. The extension opened for passenger service on August 1, 1884. The opening of the line made the Staten Island Rapid Transit Railway Company's 99-year lease of the Staten Island Railway effective; under this agreement, the railroad to Tottenville and its properties became part of the rapid transit system.
Wiman wanted to extend the line to Saint George so all of the branches under the company's control could meet in one place and connect with the ferries to Manhattan. Most of the course of the line, however, had followed the shore along the bluffs, where ground had to be made upon to build the road. State laws could not grant the right to run a railroad through the property of the United States, hindering construction by the grounds of the lighthouse department near Tompkinsville. The company secured an Act of Congress permitting them to tunnel through a hill a near the shore. The grant for the tunnel was surrounded with restrictions that slowed progress. Construction of the tunnel began in 1885; it was 585 feet (178 m) long, and was protected by massive masonary walls on the sides and a brick-built arch 2 feet (0.61 m) in thickness overhead. The tunnel was wide enough to fit two trains side by side at a time. The cost of the project was $190,000. On November 16, 1884, Wiman, James M. Davis, Sir Roderick Cameron, Herman Clark, and Louis de Jonge incorporated the Saint George Improvement Company to handle the land and waterfront, which were recently purchased from the estate of George Law. The new company was to handle the building of a new ferry terminal at Saint George.
Opening of the North Shore and South Beach Branches
The North Shore Branch was completed in 1885 and opened for service on February 23, 1886, with trains terminating at Elm Park. Travel times between Manhattan and Elm Park were reduced from 90 minutes with the old ferry system to 39 minutes. On March 7, 1886, the key piece of Wiman's plan, the Saint George Terminal, opened; North Shore trains operated between Elm Park and Saint George, and East Shore trains operated between Saint George and Tottenville. In early 1886, in anticipation of the opening of the terminal and the consolidation of operations, the former Staten Island Railway stations from Clifton to Tottenville were upgraded from low-level platforms to high-level platforms to match the platforms on the new lines. In mid-1886, the North Shore Branch opened its new terminal at Erastina. In 1889-1890, a station was built at the South Avenue grade crossing at Arlington, where trains were reversed on their way back to St. George. Even a few years after its opening, most trains terminated at Erastina.
A 1.7-mile (2.7 km)-long branch, then known as the Arrochar Branch, was opened to Arrochar on January 1, 1888, as a double-tracked line. The branch split off at Clifton Junction; it had two stops--Fort Wadsworth and Arrochar. In its first year, the branch carried heavy traffic, especially during the summer months. As evidenced by a map from 1884, the South Beach Branch was originally intended to run to Prominard Street in Oakwood Beach. The extension, however, was not built because the SIRT could not gain the Vanderbilt family's approval to cross their New Dorp Beach farm. Instead, the line was only built as far as South Beach. During Fiscal Year 1893, the SIRT purchased land to extend the line 1.75 miles (2.82 km) to South Beach and the 2.3-mile (3.7 km) South Beach Branch was completed in 1894.
Improvements on the line to Tottenville
To improve service, under B&O control, a large portion of the line was double-tracked. A second track was built between New Dorp and a point near Clifton in 1887 and 1888. Two new stations, Garretson and New Dorp, were opened the following year. In 1893, to pay for more improvements--including double-tracking and a new station at Tottenville--the Staten Island Railway issued a mortgage. In 1895, land in St. George and Stapleton was acquired for yard space and station use. Between June 1895 and December 1895, the line was double tracked to Annadale. Between 1896 and 1899, the portion of the 12.64-mile (20.34 km) line that was double tracked was increased from 5.8 miles (9.3 km) to 10.04 miles (16.16 km).
In 1896, the terminal at Tottenville was moved 600 feet (180 m) to provide closer connections to the Perth Amboy Ferry and to provide new ferry slips. The terminal had been located on the east side of Main Street but as part of the work it was moved to Bentley Street. The change had a negative effect on local businesses, changing the character of Main Street and marking a decline of its commercial viability. To built the new terminal, property had to be acquired. In 1910, the SIR withdrew its property at Main Street that has been the old ferry docks.
Extension to New Jersey
The B&O made various proposals for a railroad between Staten Island and New Jersey. The accepted plan consisted of a 5.25 miles (8.45 km) section from the Arthur Kill to meet the Jersey Central at Cranford, through Roselle Park and Linden in Union County. In October 1888, the B&O created the subsidiary Baltimore & New York Railway (B&NY) to build the line, which was to be operated by the SIRT. Construction started in 1889 and the line was finished later that year. After three years of effort by Erastus Wiman, Congress passed a law on June 16, 1886, authorizing the construction of a 500-foot (150 m) swing bridge over the Arthur Kill. The start of construction was delayed for nine months because it awaited approval of the Secretary of War, and another six months due to an injunction from the State of New Jersey. construction had to continue through the brutal winter of 1888 because Congress had set a completion deadline of June 16, 1888; two years after signing the bill. The bridge was completed three days early on June 13, 1888.
When it opened, the Arthur Kill Bridge was the largest drawbridge ever constructed; it cost $450,000 and was constructed without fatalities. The bridge consisted of five pieces of masonry; the center one being midstream with the draw resting on it. The bridge's drawspan was 500 feet (150 m), the fixed spans were 150 feet (46 m), and there were 208 feet (63 m), making the bridge 800 feet (240 m) wide. The bridge was 30 feet (9.1 m) above the low water mark. Construction of the draw needed 656 tons of iron, and 85 tons were needed for each of the approaches. Trains were planned to start running on the bridge by September 1, but because the approaches were not finished, this was delayed until January 1, 1890, when the first train from Saint George Terminal to Cranford Junction crossed the bridge. Because the land for the approaches was low and swampy, 2 miles (3.2 km) of elevated structure was built; 6,000 feet (1,800 m) on Staten Island and 4,000 feet (1,200 m) in New Jersey. The North Shore Branch was opened to freight traffic on March 1, 1890. On July 1, 1890, all of the B&O's freight traffic started using the line. The B&O paid the Staten Island Rapid Transit Railroad 10 cents-per-ton trackage to use the line from Arthur Kill to St. George. Once the Arthur Kill Bridge was completed, pressure was brought upon the United States War Department by the Lehigh Valley Railroad and the Pennsylvania Railroad to have the newly built bridge torn down and replaced with a bridge with a different design, claiming it was an obstruction for the navigation of coal barges past Holland Hook on the Arthur Kill. Their efforts were not successful.
In September 1890, Wiman secured the rights for a tunnel between Brooklyn and Staten Island; these tunnel rights were acquired by the New Jersey and Staten Island Junction Railroad Company. In May 1900, the Pennsylvania Railroad and other railroads secured an informal agreement to use the North Shore Branch from the Arthur Kill Bridge and the tunnel rights for a tunnel to 39th Street in Brooklyn. This was intended to allow freight trains to travel directly between Boston and Washington.
Reorganization
The B&O was bankrupt by February 1896; in its attempt to reach the New York market, its western lines fell into disrepair. J.P. Morgan replaced the railroad's top management to refinance it. The new terminal at Saint George was completed in 1896 after work was contracted for the project in Fiscal Year 1893. The building was designed by the architects Carrere and Hastings, and was built with ironwork framing. At the time, it was the largest terminal in the United States to have ferry, rail, vehicular, pedestrian and trolley services. Trolley companies on Staten Island insisted on access to the new terminal, but were rebuffed by the B&O. The issue went into court, and the B&O ended up splitting the cost for the trolley terminal and the long viaduct with the trolley operators. In October 1897, the ticket choppers at the stations of the railway were removed; hereafter conductors collected tickets.
In 1895, trolley service was inaugurated on Staten Island; it attracted passengers from the SIRT, ending the railroad's monopoly. As a result, the railroad went into bankruptcy. On April 20, 1899, the SIRT and all of the real and personal property held in the company was sold at auction for $2,000,000 to representatives of the B&O. The railroad already owned the line from Elizabethport, New Jersey to South Beach, including the Arthur Kill Bridge. At the time, it was rumored the B&O trains would be rerouted from Communipow station to Saint George. There was no change in the SIRT's management after the purchase. On July 1, 1899, the Staten Island Rapid Transit Railroad Company defaulted on its payment of interest on its second mortgage bonds, and its lease of the Staten Island Railway ended on July 14 when it was put into receivership. On July 31, 1899, the Staten Island Rapid Transit Railway Company--also shortened to Staten Island Rapid Transit, or SIRT-- was incorporated for the purpose of operating the Staten Island Rapid Transit Railroad Company, with the transaction taking place on August 1, 1899. The section of the SIRT's line between St. George and Clifton Junction was jointly operated with Staten Island Railways.
Modernization: 1900-1949
Pennsylvania Railroad control: 1900-1913
Pennsylvania acquisition
Improvements were made to the SIRT after the Pennsylvania Railroad (PRR) under the leadership of president Alexander Cassatt took control of the B&O. Cassatt was named president of the PRR in 1899, and he allied with the New York Central Railroad for a "community of interest" plan. Cassatt wanted to end the rebate practice being undertaken by Standard Oil and Carnegie Steel--both larger shippers--that kept the freight rates extremely low. To achieve this, the two railroads bought stock in smaller, weaker trunk line railroads. The New York Central bought stock in the Reading Company, while the PRR bought stock in the Chesapeake and Ohio Railway, the Norfolk Southern Railway, and in the B&O--including the SIRT and the ferries on Staten Island. The plan worked; the average freight rate for the two companies rose. Cassatt first purchased B&O stock in 1899, most of it being under PRR control by 1901. After the PRR took more direct control of the B&O, including the SIRT; in May 1901, improvements were made to the rail line. PRR control of the line decreased with a new PRR president, and in 1906, the PRR sold half of its B&O stock to the Union Pacific Railroad. The remainder of the PRR's stock in the B&O was sold to the Union Pacific in 1913.
Improvements
Under PRR control, the B&O was profitable again and became a stronger railroad. The PRR allowed the B&O's newly developed properties to remain intact. On October 13, 1903, the SIRT started a trial passenger service from Plainfield, New Jersey to St. George, running via the Central Railroad of New Jersey past Cranford Junction. The SIRT operated four trains every day, except for Sunday, with direct connections with the B&O's Royal Blue service between New York City and Washington, D.C. at Plainfield. These trains consisted of a locomotive and two passenger coaches. While this service was in operation the B&O sold tickets for its main line trains at the railroad's ferry terminals in Brooklyn, at South Ferry, and at St. George. The service was discontinued in 1903 because it was unprofitable. The PRR bought four large double-decker steamers to halve the travel time on the Staten Island Ferry. Even though the PRR improved ferry service, the B&O was ejected from the Whitehall Street terminal on October 25, 1905, when the city took ownership of the ferry and terminals. The city built a new Saint George Terminal for $2,318,720.
The PRR increased the number of daily trips to 28, and in 1902, it began contemplating the electrification of the rail line. The PRR's investment in the southern portion of the Perth Amboy sub-division was credited for the increased development of the South Shore of Staten Island. As such, in about 1902, a new station was constructed at Whitlock to serve a new community being built by the Whitlock Realty Company on the South Shore. The development company incentivized prospective buyers to bid on newly-built houses by promising a year's free commutation between Manhattan and Whitlock for for the first 25 houses. In December 1912, the SIRT petitioned the Public Service Commission (PSC) to allow the railway to abandon the station and replace it with a station named Bay Terrace 1,594 feet (486 m) to the south. The change was made, anticipating a shift in the center of population in the community. After 1900, several new houses were built in the community of Annadale and several parts of the Little Farms development. In 1910, as part of the development, the building company built a new railroad station. As a result, on March 22, 1910, the SIRT petitioned the PSC to allow it to discontinue its service at Annadale station and replace it with a new station of the same name 450 feet (140 m) to the west.
Increase in traffic
In 1890 and 1906, respectively, the car float terminal and freight yard at Saint George, and Arlington Yard were opened. The two main freight yards on Staten Island, Arlington and Saint George, were at capacity, and in 1912, to ease the congestion, the B&O began running freight via the Jersey Central into Jersey City. The B&O profited from the heavy coal trade that operated via the lines on Staten Island. In 1920, 4,000,000 tons of freight had been handled on the railway. In addition, passenger traffic on the line increased. Between 1903 and 1920, daily trips on the North Shore Branch increased from 50 to 65; from 50 to 60 on the South Beach Branch; and from 22 to 34 on the Tottenville Branch. In 1920, 65 trains ran daily on the North Shore Branch; 60 trains ran daily on the South Beach Branch; and 34 trains ran daily on the Main Line or Tottenville Branch. Most of the railway's passengers used the North Shore and South Beach branches. In 1920, 8,000,000 passengers used the North Shore and South Beach branches while 5,000,000 passengers used the main line. Until 1921, 3,369,400 trains had been operated on the SIRT with no fatalities.
Electrification: 1923-1925
On June 2, 1923, the Kaufman Act was signed by Governor Al Smith, madating that all railroads in New York City-- including the SIRT--be electrified by January 1, 1926. As a result, the B&O drew up electrification plans, which were submitted to the PSC. The plans were approved by the PSC on May 1, 1924, and construction began on August 1, 1924. The SIRT was to be electrified using 600 volt D.C. third-rail power distribution so it would be compatable with the Brooklyn-Manhattan Transit (BMT) once a planned tunnel was completed under the Narrows to Brooklyn with a connection to the BMT Fourth Avenue Line of the New York City Subway system. The B&O planned to use this tunnel to connect its freight from New Jersey to freight terminals in Brooklyn and Queens, including to a planned port at Jamaica Bay. The city started construction on the Narrows tunnel in 1924, but it was halted in 1926 due to political pressure and the project's increasing cost. Only the shafts at either end were constructed. The SIRT ordered ninety electric motors and ten trailers (later converted to motors) from the Standard Steel Car Company to replace the old steam equipment. These cars, the ME-1s, were designed to be similar to the Standards in use by the BMT.
The first electric train was operated on the South Beach Branch between South Beach and Fort Wadsworth on May 20, 1925; and regular electric operation began on the branch on June 5, 1925. As part of the electrification project, the South Beach Branch was extended one stop to Wentworth Avenue from the previous terminus at South Beach. Wentworth Avenue had a short, wooden, half-car platform, and a shelter was built there. That location had previously been used as a servicing and turning point for the line's steam-powered locomotives. Electric service began on the Perth Amboy sub-division on July 1, 1925, to much fanfare. The North Shore Branch's electrification was completed on December 25, 1925, and resulted in a time savings of ten minutes from Arlington to St. George. because of the high cost of electrification, however, St. George and Arlington Yards, along with the Mount Loretto Spur, and the Travis Branch were not electrified. Thirteen steam engines were retired and four new, wholly automatic substations opened at South Beach, Old Town Road, Eltingville, and Tottenville. A modern signaling system was put into place in the Saint George Yards, allowing one dispatcher to do all the work. The Clifton Junction Shops were updated to maintain electric equipment rather than steam equipment, and a large portion of the yard was electrified. Grade crossing elimination began between Prince's Bay and Pleasant Plains.
The promise of a faster, more reliable electrified service spurred developers and private individuals to purchase land alongside the SIRT lines, with the intention of providing housing to attract residents to Staten Island. On July 2, 1925, for the first time since its opening, the railroad stopped reserving its trains' first car for smokers. A petition was sent to the railroad to reverse this decision.
Expansion
In the 1920s, a branch was built to haul materials to construct the Outerbridge Crossing. The branch ran along the West Shore from the Richmond Valley station, and originally ended at Allentown Lane in Charleston, past the end of Drumgoole Boulevard. The branch was cut back south of the bridge after the bridge was completed. The Gulf Oil Corporation opened a dock and tank farm along the Arthur Kill in 1928; to serve it, the Travis Branch was built south from Arlington Yard into the marshes of the island's western shore to Gulfport. At this time, the B&O proposed to join the two branches along the West Shore. The West Shore Line, once completed, would have allowed trains to run between Arlington on the North Shore sub-division and Tottenville on the Perth Amboy sub-division. In addition, freight from the Perth Amboy sub-division would no longer be delayed by the congestion of Saint George Yard and the frequent passenger service of the SIRT. This proposal was canceled because of the Great Depression.
In the 1930s, there was a proposal to build a loop joining the Perth Amboy sub-division at Grasmere with the North Shore Branch at Port Richmond. There also was a proposal to join the North Shore Branch to Tottenville without using the existing West Shore tracks. Staten Island Borough President Joseph A. Palma, in 1936, proposed to extend Staten Island Rapid Transit to Manhattan (via New Jersey) across the Bayonne Bridge, which had been built to accommodate two train tracks. The Port of New York Authority endorsed the second plan in 1937, with a terminal at 51st Street in Manhattan near Rockefeller Center to serve the trains of Erie, West Shore, Lackawanna, Jersey Central, and trains from Staten Island. This original proposal would be brought back in 1950, by Edward Corsi, a Republican candidate for Mayor of New York City.
On February 4, 1932, the headway on trains was decreased to 15 minutes from 20 minutes between 9:29 p.m. and 10:29 p.m.; and was decreased to 30 minutes from 40 minutes between 10:29 p.m. and 1:29 a.m. on the Perth Amboy Division.
On May 3, 1948, the United States House of Representatives approved a bill to permit the SIRT to widen its railroad tunnel at the Saint George Ferry Terminal. The tunnel, which was constructed under Federally-owned land, was widened 19 feet (5.8 m) for a distance of 456 feet (139 m). The tunnel allowed for the laying of a third track, and permitted the operation of more trains from Saint George to Tottenville and South Beach. The extra track also facilitated better handling of trains at the ferry terminal at Saint George. The bill passed the United States Senate on June 1, 1948, and it was signed into law by President Harry Truman on June 14, 1948.
Grade crossing elimination: 1912-1950
On December 26, 1912, the City of New York granted the SIRT the right to construct a second track between Huguenot and Pleasant Plains, with completion expected in three years. The grant was for 25 years but this project was not completed until 1934. During Fiscal Year 1915, a second track was completed between Annadale and Pleasant Plains, and grade crossings elimination projects were undertaken at Amboy Road, Huguenot Park, and Pleasant Plains.
In August 1917, the PSC adopted an order directing the SIRT and other railways to keep the gates at 33 grade crossings closed between midnight and 5 a.m. for vehicle safety. On June 25, 1926, the Transit Commission ordered the elimination of four grade crossings on Staten Island--at Bay Street in Clifton, and at Hope Avenue, Belair Road, and Tompkins Avenue in Fort Wadsworth. The project would cost $1,000,000, with half of the cost going to the railroad and a quarter each to the city and state. At the time, the grade crossing at Bay Street was thought of as the most dangerous grade crossing on Staten Island. The elimination of grade crossings continued in the 1930s in all three sub-divisions. On the Perth Amboy sub-division, a large grade-elimination project took place on the southern portion of the line. The project was completed in 1934; new brick stations were built and the single-track portion of the line that ran through Skunk's Misery was double-tracked; the latter requiring a lot of rock fill.
The Grasmere-Dongan Hills grade crossing elimination project was completed in 1934. The project eliminated 11 crossings and cost $1,576,000. The crossings were removed by putting the line in an open cut through Grasmere and elevating it through Dongan Hills.
The East Shore sub-division was elevated in 1936-1937 to remove several grade crossings. A huge undertaking was required to remove grade crossings on the North Shore sub-division. The Port Richmond-Tower Hill viaduct was built to remove eight grade crossings; it was longer than a mile and became the largest grade crossing elimination project in the United States. The viaduct opened on February 25, 1937, marking the final part of a $6,000,000 grade crossing elimination project on Staten Island, which eliminated 34 grade crossings on the north and south shores. A two-car special train, which carried Federal, state, and borough officials, made a run over the viaduct and the seven-mile project. Stations closed for the viaduct project at Tower Hill and Port Richmond were reopened on this date.
Between 1938 and 1940, a grade crossing elimination project was undertaken over three miles between Great Kills and Huguenot, eliminating seven grade crossings and costing $2,136,000, which was partially paid for by the city, state, and Progress Work Administration funds. The line was depressed into an open cut between Great Kills and Huguenot, with the exception of a section through Eltingville where it was elevated. Four stations--Great Kills, Eltingville, Annadale and Huguenot--were completely replaced with new stations along the rebuilt right-of-way. The project started on July 13, 1938, and was completed in October 1940. The stations themselves were completed in 1939, and therefore have the date 1939 inscribed either on road overpasses or on railroad bridges.
In that same year, grade crossing eliminations were completed in Richmond Valley and Tottenville. The Richmond Valley project eliminated the crossing at Richmond Valley Road and cost $300,000 while the Tottenville project eliminated seven crossings--including one at Main Street--and cost $997,000. The only remaining grade crossings to be removed were at Grant City, New Dorp, Oakwood Heights, and Bay Terrace. These projects were delayed due to material shortages during World War II. In 1949, a project to eliminate 13 grade crossings on the Perth Amboy sub-division, at Grant City, New Dorp, Oakwood Heights and Bay Terrace, was set to begin, with a projected cost of $7,400,000. On August 30, 1950, the PSC announced a $6,500,000 plan to eliminate grade crossings of the SIRT. The plan was only approved with the assurance from the city that if passenger service was discontinued, the city would guarantee residents of the area would have some form of public transportation. The plan also included the construction of a bridge over the never-built Willowbrook Expressway.
World War II
Freight and World War II traffic helped pay off some of the debt the SIRT had accumulated, briefly making it profitable. B&O freight trains operated to Staten Island and Jersey City. Around this time, B&O crews began running through without changing at different junctions. Regular B&O crews and Staten Island crews were separated, meaning the crews had to change before they could enter Staten Island. All traffic to and from Cranford Junction in New Jersey was handled by the SIRT crews. During the war, all east coast military hospital trains were handled by the SIRT--the trains came onto Staten Island through Cranford Junction, with some trains stopping at Arlington to transfer wounded soldiers to a large military hospital. The Baltimore & New York Railway line become extremely busy with troop movements, prisoner-of-war trains, and war material operating over this stretch to reach their destinations. Two B&O subsidiaries, the B&NY and the Staten Island Rapid Transit, were merged on December 31, 1944. Since the Baltimore & New York Railway opened in 1890, the SIRT operated this line with locomotives belonging to itself and to its parent company, the B&O. Around the time of World War II, the B&O operated special trains for important officials. One special was operated for former Prime Minister of the United Kingdom, Sir Winston Churchill. The train took him to Stapleton, from where he boarded a ship to Europe. The SIRT made special arrangements for the trip, including a shined-up locomotive with sporting polished rods, white tires, and an engine crew clad in white uniforms.
Fires
Tottenville station was destroyed by a fire on September 3, 1929. The fire was attributed to a short-circuited third rail. The two 550 foot (170 m)-long platforms were destroyed, as were five train cars being stored near the station. The damage was estimated to cost $200,000. Passengers using the Perth Amboy Ferry were forced to use the nearby Atlantic station instead.
On June 25, 1946, a fire wrecked the terminal at Saint George, killing three people and causing damage worth $22,000,000. The fire destroyed the ferry terminal and the four slips used for Manhattan service, the terminal for Staten Island Rapid Transit trains, and a small building and slip owned by the city and used by the Army and Navy to transport personnel from Staten Island to the United States Naval Depot at Bayonne, New Jersey. Twenty rail cars were also destroyed in the fire. Two days after the fire, the city voted $3,000,000 to start work on a new $12,000,000 terminal that would be opened in 1948. On June 8, 1951, a modern replacement terminal for Saint George opened, although portions of the terminal were phased into service at earlier dates.
Service scaledowns and the end of B&O operation: 1947-1971
Transfer of ferry service: 1947-1948
On October 28, 1947, the SIRT filed with the Interstate Commerce Commission (ICC) to get permission to discontinue ferry service between Tottenville and Perth Amboy Ferry Slip in Perth Amboy, New Jersey. The SIRT said the abandonment should be permitted because of "the substantial deficits being incurred in operation of the service, which covers a distance of 3,600 feet". On September 22, 1948, the ICC allowed the SIRT to abandon the ferry, which it had been operating for 88 years. The ferry operation was transferred to Sunrise Ferries of Elizabeth, New Jersey, which had agreed to lease the railway's ferry facilities at Tottenville and to lease Perth Amboy wharf and dock properties there. The service was transferred on October 16. The schedules and the five-cent fare for the ferry were maintained. In 1963, Perth Amboy ferry service was discontinued.
Service cuts and the discontinuation of service: 1948-1953
On October 28, 1947, Mayor John Delaney of Perth Amboy created a plan to fight the SIRT's proposal to abandon service between St. George and Tottenville. The Mayor criticized the railroad for failing to notify the city of its intentions. This effort to discontinue service failed, but on July 1, 1948, the New York City Board of Transportation took over all of the bus lines on Staten Island. As a result, the bus fare on Staten Island dropped from five cents per zone (twenty cents Tottenville to the ferry) to seven cents for the whole island, to match the fare of the other city-owned bus lines. The cheaper bus fare resulted in an exodus of passengers from the SIRT. In 1947, the SIRT had carried 12.3 million passengers but after the decrease in bus fares the number decreased to 8.7 million in 1948 and to 4.4 million in 1949. Three months after the change, passenger traffic dropped 32 percent on the Tottenville Division and 40 percent on the other two divisions. The buses saw a 25 percent increase in ridership.
Due to the loss of ridership, on August 28, 1948, the SIRT announced it would reduce service on all three branches on September 5. Service would be reduced from 15-minute intervals in non-rush hours to 30-minutes during that time, and from 5 to 10 minutes in rush hours to 10 to 15 minutes during rush hours. The day afterwards, Richmond Borough President Cornelius A. Hall and Staten Island civic organizations announced they would oppose the proposed cuts. The PSC elected not to prevent the cut in service on September 2, 1948, and the cut went into effect three days later. 237 of the previous 492 weekday trains were cut and the schedule of expresses was reduced during rush hours. In addition, all night trains after 1:29 a.m. were eliminated. The reduction of trips resulted in the firing of 30 percent of the company's personnel.
On September 7, 1948, Borough President Hall continued to rally against the SIRT's cuts at a PSC hearing in Manhattan. Commuters testified that trains were missing connections to ferry boats and that some trains were being held at the St. George Terminal during rush hour to wait for two boatloads of passengers. Previously, they said, the trains pulled out with only one boatload of passengers. On September 13, 1948, the SIRT agreed to add four trains and to extend the schedule of four others. On January 5, 1949, the PSC recommended the SIRT restore the service cut; if it refused, the PSC would order the SIRT to restore the service. Hall suggested lowering the fare to 10 cents or a 20-cent round trip to make up the lost money. On January 29, 1949, the PSC ordered the SIRT to restore five trains and to reschedule seven other trains for public convenience, and gave the SIRT until February 13 to carry out the order.
On May 20, 1949, the SIRT announced it intended to discontinue all of its passenger services and that it would seek permission from the PSC to do so, citing the loss of $1,061,716 in 1948. The PSC response was to rule that the railroad must continue its operations or substitute them with buses, otherwise the city should take over the railroad service as part of the municipal transit system. The SIRT made another request to discontinue its passenger service on June 3, 1952, with a date set of July 7. On June 16, the PSC ordered the SIRT to continue all of its passenger services pending a decision on the line's request to abandon its service. On July 9, hearings concerning the proposed abandonment of the railroad began. On July 16, the PSC counsel stated the operating deficits that had been charged to the SIRT's passenger service would disappear if they were included with the freight profits of the B&O in the New York area. After the hearings, the SIRT changed its planned abandonment date to September 12, 1952. The commissioner council said a provision for an additional two months of service, extending it to November 12, 1952, needed to be made.
On December 19, 1952, by a unanimous decision, the PSC gave the SIRT permission to discontinue service on the North Shore Branch and South Beach Branch after March 31, 1953. The discontinuation brought the SIRT an estimated annual saving of $308,000. The SIRT had sought permission to end service to Tottenville. After a lot of community opposition, the SIRT discontinued passenger service on the North Shore Branch and the South Beach Branch at midnight on March 31, 1953, because of city-operated bus competition; the South Beach Branch was abandoned shortly thereafter while the North Shore Branch continued to carry freight. Bus service on parallel lines was increased to make up for the loss of service on these branches. By 1955, the third rails on both of the lines were removed.
City steps in to subsidize Tottenville service: 1954-1971
On September 7, 1954, the SIRT made an application to discontinue all passenger service on the Tottenville sub-division on October 7, 1954. The PSC warned that if it discontinued its passenger service, action would be taken to remove the SIRT's parent company, the B&O Railroad, from Staten Island, meaning the end of its prospering freight operation. A large city subsidy allowed passenger service on the Tottenville sub-division to continue. Since this sub-division did not need the trains cars left over from the closure of the North Shore and South Beach lines, the SIRT sold 30 of them to the New York City Transit Authority (NYCTA) in 1953-1954 for $10,000 each.
A bill allowing New York City to lease service on the Tottenville line was approved by Governor Harriman on March 20, 1956, paving the way for an agreement between the city and the B&O. On December 13, 1956, the PSC approved an agreement between the B&O and New York City that ensured the Tottenville line would continue to operate; as part of the deal, New York City leased the line's passenger facilities for 20 years and received a small percentage of the line's net income. The SIRT continued to collect revenue and operate service. In addition, the city repaid all taxes owed by the railroad to the city. The agreement went into effect on January 1, 1957. The SIRT's financial troubles continued and in February 1960, it asked the city for $3,870,000 in subsidies, threatening to ask the PSC for permission to discontinue the service if the funds were not provided. In 1959, the SIRT lost $1,100,000, with an average daily ridership of 4,000. On August 25, 1960, the Board of Estimate approved an amendment of the city's contract with the SIRT to increase the annual subsidy. Over the next ten years, the aid was increased from $4,000,000 to $8,400,000.
On April 5, 1962, a fire at Clifton Yard destroyed seven ME-1 train cars and a warehouse, adding to 13 lost in two previous fires and two that were scrapped, leaving the SIRT with only 48 cars to operate regular service. This car shortage meant 44 of its 48 train cars were in service during rush hours, leaving a small margin for errors. To maintain the previous level of service, the SIRT had carefully scheduled maintenance for their train cars; a number of trains were rushed back to Saint George as passenger-free expresses after dropping their loads in the evening rush, helping make up for the lack of train cars. The NYCTA set aside nine BMT Standards for possible transfer to the SIRT. The SIRT also looked at a proposal to transfer some D-type cars. Neither of the proposals were acted upon.
On July 13, 1967, Mayor John Lindsay announced the city was considering purchasing the 48 air conditioned train cars used at Montreal's Expo 67 to transport passengers between the city and the exposition grounds. The cars would have cost $3,840,000, or about $80,000 each, and were expected to be available in October once the fair closed. These cars were 11.7 percent larger than the cars then in service on the SIRT.
Freight operations: 1957-1971
On October 21, 1957, four years after North Shore sub-division passenger trains ended, a train from Washington, D.C.--the last SIRT special--carried Queen Elizabeth II and Prince Philip across the Arthur Kill Bridge en route to the Staten Island Ferry after a meeting with President Eisenhower. The special train movement was conducted in secrecy and the tracks along the route were cleared for this occasion. The train traveled over B&O, Reading Company, and Lehigh Valley lines to get to Staten Island Junction and the SIRT. The royal train, along with a press train, ended its run at a freight yard at Stapleton.
In November 1957, the Arthur Kill swing bridge was knocked off its center pier foundation by a passing oil tanker, rendering the bridge useless. Freight had to be rerouted through float bridges, with most of it passing through the Central Railroad of New Jersey's yards. On August 25, 1959, the damaged bridge was replaced with a state-of-the-art, single track, 558-foot (170 m) vertical lift bridge. The 2,000 ton lift span was prefabricated then floated into place. The new bridge was raised 135 feet (41 m); because the new bridge aided navigation on the Arthur Kill, the United States Government assumed 90 percent of the $11,000,000 cost of the project. The old bridge had been condemned and ordered replaced by the United States Secretary of the Army in 1949, with an expected cost of $8,000,000 to be split between the SIRT and the U.S. Government. When the bridge reopened, long-unit coal trains from West Virginia began using an extension of the Travis Branch, on Staten Island's West Shore to serve a new Consolidated Edison power plant in Travis.
The closure of Bethlehem Steel in 1960 and of U.S. Gypsum in 1972 led to a dramatic decline in rail traffic via the Arthur Kill Bridge, although there still was enough traffic in the 1970s to keep car floats reasonably busy.
Final grade-crossing elimination: 1960-1964
A tragic accident took place on November 7, 1960 at the grade crossing at North Railroad Avenue and Bancroft Avenue, four blocks away from the New Dorp station. An eight-year old girl was killed and thirty-one young kids were injured as a train struck a crowded school bus as it was about to exit the crossing. This crossing, and the twelve others along this stretch of the line, was ordered closed by a grand jury when a high school girl was killed by a train at a crossing eight blocks away in December 1959. The railroad had been given an extension of time so that it could install gates. On November 10, 1960, Staten Island Borough President Albert Maniscalco ordered that this grade crossing be closed, and announced that he expected work to begin on eliminating the grade-crossing the following year.
On August 29, 1964, the PSC approved a $10,923,000 project to eliminate the last remaining grade-crossings on the line between the Jefferson Avenue and Grant City stations. As part of the project, new platforms and station buildings were built at New Dorp and Grant City, and new platforms were built at Jefferson Avenue. To eliminate the grade crossing, the line will be raised on an embankment for part of the way and depressed into an open cut for the rest. In order to avoid interfering with train service, a shoo-fly track was constructed to the east of the original line, while a new crossing free line was constructed upon the original right of way.
City operation of passenger service: 1971-present
Transfer to MTA operation: 1968-1971
In May 1968, the President of the MTA, William Ronan, proposed that New York City take control of the SIRT and spend $25 million on modernizing the line. This proposal was part of a twenty-year, $2.9 billion plan announced by the agency on February 28. Some of the money allocated to the SIRT would be used for purchasing new trains. On December 18, 1969, the Board of Estimate approved the purchase the SIRT for $1, with $3.5 million to be used to purchase the line's 48 cars, 70 acres of real estate, the air rights over the tracks, and the line's Clifton Shops. The additional land was purchased to allow for a wider right-of-way, and to allow for parking lots and station improvements. As part fo the agreement, the B&O would continue to operate freight service over the line once a day.
On January 1, 1970, New York City's lease of the Tottenville line was terminated; after that date the city reimbursed the railroad for its passenger deficits. On May 29, 1970, New York City and the SIRT entered an agreement for NYC to purchase the Tottenville line. As part of the agreement, the SIRT was reserved the right to operate freight service over the line. The City was required to ensure that the trackage was in good condition for SIRT's freight operations. On June 29, 1970, the Staten Island Rapid Transit Operating Authority was incorporated as a subsidiary of the state's Metropolitan Transportation Authority in order to acquire and operate the SIRT.
On April 21, 1971, the ICC approved the city's purchase of the line from the SIRT. The SIRT would continue to operate freight over the line. On July 1, 1971, operation of the Tottenville line was turned over to the Staten Island Rapid Transit Operating Authority, a division of the state's Metropolitan Transportation Authority, and the line itself was purchased by the City of New York for $1. The MTA paid the B&O $3.5 million for the line's equipment. As part of the agreement, freight along the line was to be continued to be handled by the B&O. Grade crossings had to be eliminated along the Tottenville line by the B&O in order to make the deal with the city final. Even though they were supposed to have been eliminated in the 1930s, a lack of finances, partially resulting from the Great Depression and World War II, prevented it.
MTA improvements: 1970s and 1980s
On June 15, 1972, five 1955 air conditioned coaches on loan from the Long Island Rail Road went into service on the SIRT. One three-car train made one round trip during the morning, and operated again during the afternoon peak. As a result of previous tests, the edges of the platforms at the St. George Terminal were trimmed for the extra clearance required by the LIRR cars, which were 85 feet (26 m) long. The cars were only 15 feet (4.6 m) longer than the 45 cars in operation, but the LIRR cars' seating capacity of 123 passengers was almost double the limit of the other coaches.
On February 1, 1972, the fare on the SIRT was increased, for the first time since 1958, to thirty-five cents. The increase was from an average fare of twenty-two cents: the system used to have zoned fares. The fare increase applied to the whole system, and was accompanied by the elimination of commutation tickets and student tickets. Previously, fares ranged from twenty to thirty-five cents. Sixteen percent of riders of the 17,000 daily riders had no change in fare. There was a ten percent increase for fifty-one percent of passengers and a fifteen percent increase for the remaining thirty-three percent. The fare increase was expected to bring in an extra $400,000 a year.
At the time, the line was operating at a deficit of $2.9 million a year, with $2.5 million of it offset by a subsidy from the city. The MTA, at the time, had plans for a $25 million improvement program for the line, including new train cars. Improvements were also planned for the tower and signal systems, for the roadbed and for the stations. Increased power, 8,000 feet (2,400 m) of new rails, and mercury-vapor lighting at fourteen of the twenty-two stations were also part of the plan. Three quarters of the $25 million were to be provided by 1967 state transportation bond issue. The remaining $6.25 million was to be paid by the city.
On February 28, 1973, the first six new R44 cars were put into service on the SIRT. These were the first six out of a 52 car order from the Saint Louis Car Company-the same type of cars as the newest cars then in use on the subway lines in the other boroughs. The R44s replaced the ME-1 rolling stock that had been inherited from the B&O and had remained in continuous service since 1925 when the system was electrified.
As part of the MTA's inaugural Capital Program from 1981, Pleasant Plains and Prince's Bay were rebuilt, and the platforms at several stations were lengthened.
Problems persist: 1970s and 1980s
However, during the 1970s, the MTA's ability to improve service on the line was hampered by several strikes by the SIRT's workers. From December 11, 1975 to April 1976, service on the SIRT was shutdown because the line's 61 motormen and conductors went on strike. The strike ended once they voted to receive 14% wage increases.
Between 1975 and 1984, due to improvements made on the line, ridership increased by 40 percent. However, on October 22, 1986, midday service was reduced from running every 20 minutes to running every 30 minutes due to a reduction in ferry service. Weekend service was reduced by 15 trains to 78, and weekday service was reduced by 15 to 109. In the following two years, ridership reduced from 6.47 million to 6.23 million. On August 6, 1980, a commitee of the MTA evaluated whether it should continue operating the rail line.
Improvements in fare collection: 1986-1994
In 1986, ticket collection began at St. George, and tokens began to be accepted at St. George on April 20, 1988. Just a month later, tokens were used by 80 percent of riders. Tokens could be bought at vending machines between 6 a.m. and 10 a.m. at Huguenot, Annadale, Eltingville, Great Kills, Oakwood Heights, New Dorp, Grant City and Dongan Hills. Tokens could be bought at St. George at all times. On October 18, 1992, the NYCTA began distributing free transfers between the SIRT and local bus routes on Staten Island.
On March 31, 1994, MetroCards began being accepted for fare payment at the St. George station, making it the 50th station, New York City Subway and Staten Island Railway, to receive it. On July 4, 1997, the MTA eliminated fares for trips between Tompkinsville and Tottenville. This fare cut was part of the "One City, One Fare" fare cuts in 1997. The change was made, in part, as no turnstiles were installed at any of the other stations along the line. Riders using St. George began having to pay while entering and exiting. Previously, fares were collected on board by the conductor. Passengers on weekday trains arriving at St. George between 5:50 a.m. and 10:50 a.m. had to pay their fare with a token, special fare ticket, or a transfer when they exited. MetroCards were accepted at St. George, while cash, transfers, tokens, and special fare tickets were accepted by conductors at the other stations. On this same date, the Staten Island Ferry was made free. The union representing the SIR's workers, United Transportation Union local 1440, was worried about the change, in part because of an expected rise in ridership. The removal of fares was blamed for an immediate spike of crime along the line.
Rebranding and service improvements: 1990s
The Staten Island Rapid Transit was rebranded as the MTA Staten Island Railway (SIR) by the MTA on April 2, 1994. Staten Island Railway was the line's original name. This move followed the transfer of the Staten Island Rapid Transit from the New York City Transit Authority's Surface Transit Division to the Department of Rapid Transit on July 26, 1993.
In December 1991, late night service on the SIRT began running with two-car trains instead of four-car trains. This change was originally intended to go into effect by June 1988. In 1988, it was decided to transfer twelve R44 cars from the New York City Subway to the SIR in anticipation of expanding trains to five cars in order to accommodate an expected growth in ridership and to reduce overcrowding, which did not materialize. However, during the mid-2000s some trains did run with five cars. The SIR timetable stated that "Select rush hour trains operate with additional cars. For a more comfortable ride, please use all available cars." 18 stations had their platforms lengthened to accommodate five-car trains in 1988.
In 1993, the Dongan Hills station became accessible under the Americans with Disabilities Act of 1990. In 1998, renovations were completed at St. George, Tompkinsville, Stapleton, New Dorp, Richmond Valley and Tottenville.
On April 7, 1999, three additional p.m. express runs were added to the schedule, almost doubling the previously scheduled express service. These express runs skipped stops between St. George and Great Kills.
On June 24, 2001, a small section of the easternmost portion of the North Shore Branch (a few hundred feet) was reopened to provide passenger service to the new Richmond County Bank Ballpark, home of the Staten Island Yankees minor-league baseball team. The station cost $3.5 million to build. One train was scheduled to travel to/from Tottenville, with two or three shuttle trains from St. George serving the station. Trains last served the station in September 2009 as the service was discontinued on June 18, 2010, the first date of the first scheduled home game for the Yankees, as part of budget cuts. The elimination of this service saved $30,000 annually.
Consistent growth: 2000s and 2010s
In 2004, the SIR put out its preliminary budget for 2005, and as part of the budget it proposed several service cuts to offset an increased size of debt. For 2005, the agency proposed implementing One Person Train Operation, adding fare collection at Tompkinsville, reducing the fleet back to 52 cars, the elimination of express serice, and reducing trains to two cars during off peak hours. For 2006, it proposed eliminating weekend service from 2 a.m. Saturday to 5 a.m. Monday. Starting on May 1, 2005, SIR trains started running with two cars between the hours of 9 p.m. to 5 a.m. every night, stopping near station entrances in order to deter crime.
In June 2005, a new cab signaling system and a new control center went into effect at St. George. These improvements cost $100 million, and helped enhance safety and increase operational flexibility. The new signal system provides improved signal visibility, continuous speed enfocement, and central monitoring at St. George, with the ability to remotely change switch positions as all switches on the main line were interlocked as part of the project. The cab signalling system sounds an alarm inside the cab to control train speeds, and automatically applies the brake if needed. Prior to the new system's implementation, there were no safeguards in place to prevent trains traveling at full speed from ignoring a signal and continuing past a bumping block. The new signal system required the installation of thirty miles of underground fiber optic cable. The signals system limits the maximum speed at certain points and at sharp curves, and limits trains to a speed of 15 miles per hour (24 km/h) when trains approach a terminal.
On July 17, 2006, rush hour express service was sped up, with all morning express trains running non-stop from New Dorp to St. George. Evening express service started earlier under the new timetable. In response to record ridership growth on the Staten Island Railway, rush hour express service was expanded in late 2007. Evening service was expanded on November 14 when five additional express trains were added, expanding the span of express service by an hour and twenty minutes. Morning service express service was expanded on December 5. The span of express service was extended by 45 minutes durign the morning with the addition of three additional express trains. In addition, express service was added in the off-peak direction to Tottenville during the morning with five express trips leaving St. George. Five additional local trains were added to the schedule.
A new stationhouse at Tompkinsville opened on January 20, 2010, with turnstiles installed for the first time. The station house cost $6.9 million, and was equipped with low turnstiles and fare vending machines. The turnstiles were installed because passengers often avoided paying the fare by exiting at Tompkinsville, and taking a short half-mile walk to the St. George ferry terminal. It was estimated that the SIR lost $3.4 million every year as a result. Trains heading to St. George during the morning rush hour, and trains leaving St. George in the evening rush hour had skipped Tompkinsville and Stapleton in an effort to reduce fare evasion. Service stopped at these stations every hour while all other rush hour trains bypassed the above stations. After the installation of the turnstiles, the revenue generated at Tompkinsville made up 15% of the SIR's revenue. Schedules were changed, with locals and most non-rush hour trains stopping. In 2010, it was announced that the MTA planned to restore fare collection on the entire line to raise move revenue and to cut down on crime. This was planned to be implemented once the MetroCard was replaced with a smartcard. In addition, in the interim, the MTA proposed installing turnstiles at Grasmere because it is a heavily used transfer point to the S53 bus which runs to Brooklyn.
In an 2006 report, the Staten Island Advance explored the restoration of passenger services on 5.1-mile (8.2 km) of the North Shore Branch between St. George Ferry Terminal and Arlington station. Completion of the study is necessary to qualify the project for the estimated $360 million. A preliminary study found that ridership could hit 15,000 daily. $4 million of federal funding was requested for a detailed feasibility study by U.S. Senator Chuck Schumer from New York. In 2012, the MTA released an analysis of transportation solutions for the North Shore, which included proposals for the reintroduction of heavy rail, light rail, or bus rapid transit using the North Shore line's right-of-way. Other options included transportation systems management which would improve existing bus service, and the possibility of future ferry and water taxi services. Bus rapid transit was the preferred for its cost and relative ease of implementation, which would require $352 million in capital investment. The project has yet to receive funding.
A new, ADA-compliant station named Arthur Kill, near the southern terminus of the present line, opened on January 21, 2017 after numerous delays. The station is sited between, and replaced the Atlantic and Nassau stations, which were in the poorest condition of all the stations on the line. Unlike the Atlantic and Nassau stations, Arthur Kill is able to platform a four-car train. The MTA has provided parking for 150 automobiles across the street adjacent to the station. Ground was broken for the $15.3 million station on October 18, 2013. The contractor for the project, John P. Picone, Inc., was awarded the contract on July 31, 2013. There has also been some discussion of building a station at Rosebank, which would bridge the longest gap between two stations (Grasmere and Clifton). A Rosebank station once existed on the now-defunct South Beach Branch of the railway.
The 2015-2019 MTA Capital Plan called for the SIR's Richmond Valley station and 32 subway stations to undergo a complete overhaul as part of the Enhanced Station Initiative. Updates would include cellular service, Wi-Fi, USB charging stations, interactive service advisories and maps, improved signage, and improved station lighting.
Decline and rebirth of freight: 1971-present
Decline: 1971-2000
The B&O became part of the larger C&O system through a merger with the Chesapeake and Ohio Railway. The freight operation on the island was renamed the Staten Island Railroad Corporation in 1971 after it was separated from the island's passenger service. On April 1, 1976, Conrail was created by the Federal Government to take over the potentially profitable lines of multiple bankrupt carriers in the northeast United States, and as a result, the B&O and C&O became isolated from their properties in New Jersey and Staten Island. As a result, most of their freight service, with the exception of one daily train to Cranford Junction, was truncated to Philadelphia. By the year 1973, the car float yard at Jersey City operated by Jersey Central had closed. Afterwards, the car float operation of the B&O was brought back to Staten Island at Saint George Yard. The New York Dock Railway took over the operation at Saint George Yard in September 1979, but this did not save it: it closed the following year. Only a few isolated industries on Staten Island were using rail service for freight, meaning that the yard at Saint George was essentially abandoned. The C&O system was forced to sell the Staten Island Railroad to the New York, Susquehanna & Western Railroad, which was owned by the Delaware Otsego Corporation on April 24, 1985, due to a lack of business. The Susquehanna then embargoed the track east of Elm Park on the North Shore Branch, ending rail freight traffic to Saint George. In 1990, Procter & Gamble, the line's largest customer closed, leading to a large drop in freight traffic. The last freight train over the bridge came in 1990, and the operation ended on July 25, 1991, when the Arthur Kill Bridge was taken out of service. Afterwards, the North Shore Branch and the Arthur Kill Bridge were taken over by CSX. The line as well as the bridge were purchased again in 1994, this time by the New York City Economic Development Corporation (NYCEDC), whose purchase was followed by a decade of false starts. In 1998, Conrail broke up, allowing parts of lines once operated by the competitors of the B&O to become a part of CSX. The railroad line was still intact from Cranford Junction to Arlington.
Reactivation: 2000-present
During the early 2000s, plans for reopening the Staten Island Railroad line in New Jersey were announced by the Port Authority of New York and New Jersey. Since the Jersey Central became a New Jersey Transit line, a new junction would be built to the ex-Lehigh Valley Railroad line. Two rail tunnels from Brooklyn were planned-one to Staten Island and one to Greenville, New Jersey-and would allow freight to pass through New York on its way from New England to the South. On December 15, 2004, a $72 million project to reactivate freight service on Staten Island and to repair the Arthur Kill Vertical Lift Bridge was announced by the NYCEDC and the Port Authority of New York and New Jersey. Specific projects on the Arthur Kill Vertical Lift Bridge included repainting the steel superstructure and rehabilitating the lift mechanism. In June 2006, the freight line connection from New Jersey to the Staten Island Railway was completed, and became operated in part by the Morristown and Erie Railway under contract with other companies and New Jersey.
The Arthur Kill Vertical Lift Bridge was renovated in 2006 and began regular service on April 2, 2007, sixteen years after the bridge closed. As part of the project, a portion of the North Shore Branch was rehabilitated, the Arlington Yard was expanded, and 6,500 feet (1,981 m) of new track was laid along the Travis Branch to Fresh Kills. Soon after service restarted on the line, Mayor Michael Bloomberg officially commemorated the reactivation on April 17, 2007. Service was provided by CSX Transportation, Norfolk Southern Railway, and Conrail over the Travis Branch to haul waste from the Staten Island Transfer Station at Fresh Kills and ship container freight from the Howland Hook Marine Terminal and other industrial businesses. Along the remainder of the North Shore Branch, there are still tracks and rail overpasses in some places.
See also Rail freight transportation in New York City and Long Island.